Minutes of the ICE section

96th meeting on Wednesday 04/12/2013 (08:40-10:30, 6/2-004)

 

ICE members: Adrian Oeftiger (AO), Andrea Passarelli (AP), Benoit Salvant (BS), Carlo Zannini (CZ), Danilo Banfi (DB), Daria Astapovych (DA), Elias Metral (EM), Elena Wildner (EW), Frank Schmidt (FS), Giovanni Iadarola (GI), Giovanni Rumolo (GR), Javier Barranco (JB), Kevin Shing Bruce Li (KL), Nicolo Biancacci (NB), Nicolas Mounet (NM), Olav Ejner Berrig (OB), Serena Persichelli (SP), Sergio Rioja Fuentelsaz (SRF), Tatiana Pieloni (TP), Werner Herr (WH), Xavier Buffat (XB).

Present/Excused: AO, AP, BS, CZ, DB, DA, EM, EW, FS, GI, GR, JB, KL, NB, NM, OB, SP, SRF, TP, WH, XB, JosephK, ChristineV, GuidoS, HannesB, FritzC, HugoD.

 

 1) Newcomers / visitors

- None.

 

2) Comments on the minutes of the previous 95th meeting + Actions

- No comment.

- List of Actions.

 

3General infos

- No particular comment from anyone.

- SL meeting:

- 2014 internal audience => Any subject we would like to be audited?

- Laurette Ponce is the new chair of the BE Career Path Panel (EM will also participate, replacing Dominique Missiaen for the ABP group).

- Comment from Oliver Aberle about possible issue with current ferrite => Change in the visual aspect after the heat treatment of the ferrites (Trans-tech material) with some green coloration. Is it really a problem? => Measurements needed afterwards to check the magnetic properties of the ferrite.

- TOTEM RP bench impedance measurements:

- Initial meas. tomorrow in parking position.

- With the motor => Meas. after Xmas.

- With the ferrite => Meas. after ~ February (when the ferrite arrives).

- What about the PS dummy septum measurements? => Some measurements to be redone due to the fact that it had to be dismantled. Reminder: this is the new key equipment for the MTE project, and we should therefore make all the necessary checks.

- LMC talk by GR on ecloud last week => Summary: 2 scenarios for start-up in 2015.

1) Plan A: Start with 50 ns scrubbing and some then some time with 50 ns to recover the 2012 results. Then, 25 ns scrubbing during ~ 1 week and then another ~ 1 week of scrubbing with the doublets-beam to be able to scrub more. And then 25 ns physics.

2) Plan B: In case of issue with the doublets-beam, do scrubbing and physics with the classical 25 ns beam or switch to a 25 ns beam with less ecloud (8b+4e).

- What are the coming important talks to be given before Christmas? => Please, as usual try and send me your talks before the meetings and let's try and discuss them together beforehand.

- ICE lunch on 18/12 => Everybody answered?

- Reminder about JoelC and the meeting in the afternoon of 18/12.

- Discussion with OliverBF on Monday at TU Darmstadt => Possible subjects for students who would spend ~ 50% at TUD and 50% at CERN. Some ecloud subjects could be discussed in the forthcoming ecloud meeting organised by GR on 16/12/12.

 

4) Tools and instruments used for beam impedance measurements (OB and JosephK): pptx

- Reminder: A 4-port network analyzer (if needed) would cost ~ 40 kCHF, but it is not needed. At the moment, we have a 2-port analyzer from Christian Carli (from LEAR I think).

- ChristineV reminded us that if we need 5 m long cables then it might be difficult to find as it is not standard => Cost is few 1000 CHF.

- Reminder: the probe method should be used (instead of the wire method) for all the cavity-like objects.

- HugoD proposed to have somewhere (on the impedance web site) available all the measurement methods on impedances => Should be the plan indeed. Remember that we will review all of them also during the next impedance workshop in April.

- FC reminded us about a workshop in 1998 in Argonne where all the dos and don'ts were reviewed.

- In summary, we all agreed that we should continue with the requests of the last slide of OB's talk.

 

5) Actions to be taken for the next meeting

- Old actions.

 

6)  Miscellaneous

- Deadlines and important dates for ICE.

- The next (97th) meeting will take place on 11/12/2013 => Agenda:

1) Status of the PSB impedance model (CZ).

 

- See preliminary agendas for the next meetings.

- See List of Actions.

 

Minutes by E. Metral, 04/12/2013.