- CNGS_2009_AFTER_FT_V1.csv => Cern Neutrinos to Gran Sasso (5 BP = 6 s).
- CBCM: CBCMHardwareSettings, Viewer1, Viewer2, ExternalConditions.
- CBCM timings and RF MMI Targets:
- CNGS1 (= SPS user Timing): Picture 1, 2, 3, 4, 5 (RF MMI target = CNGS1) and 6.
- RF Voltage (Trim settings): Picture and data.
- Tunes (Trim settings):
- Chromaticities (Trim settings):
- Transverse dampers (Trim settings):
- Damper-Gain-H: Picture and data.
- Damper-Gain-V: Picture and data.
- Octupoles (Trim settings):
- Kickers:
- Injection MKP: Picture.
- Ejection MKE4: Picture.
- Dump kicker MKD: Picture.
- RF:
- Injection phase: Picture.
- Inj. bucket selector: Picture 1 and 2.
- Injection pulses: Picture.
- Extraction pulses: Picture
- Injection B field: Picture.
- Tunes measurement (AutoQ): Picture.
- Example of a BCT: Picture.
- Example of FBCT: Picture 1, 2 and 3.
- Larger: Picture.
- TT10 and SPS injection (YASP): SPSInjection, SettingsTT10, SettingsSPSRING (Trajectory correction in the transfer line TT2-TT10 for the CT).
- SPS orbit at injection (YASP): SPSorbit0ms, SettingsSPSRING.
- SPS orbit at 4200 ms (YASP): SPSorbit4200ms, SettingsSPSRING.
- Losses:
- SPS Beam Loss Monitors RING: Picture 1, 2 and 3.
- CNGS BPM Interlock Settings: Picture 1 and 2 (Some problems).
Author: Elias Métral - AB/ABP
Last update:
Monday, November 16, 2009 11:03:49 AM
Copyright
CERN