- 1st meeting (11-11-09): EMslides and FZslides.

- 2nd meeting (20-11-09): SPS_cross_section(NG), KEKBCrabCavityCryogenics_TalkbyNakaiHirotaka(sent by RC), Coldex(NG), LSS4-(NG), LSS4+(NG), LSS5(NG), LSS4_Extr_Bump_EquipState(EM), BumpOrbitCatalog_13-05-09(EM), LSS4_Extr_Bump_YASP(EM), LHCFAST1_Orbit_20-05-08(EM), LHCFAST1_Orbit_20-05-08_Zoom(EM), SPSventilation(NG).

- 3rd meeting (04-12-09): SPSvisitInLSS4&5(NG&EM), COLDEXbypassIn41737, LocationOfSPSPeriodsAndSuperPeriods(NG), TalkByGV(COLDEXremoval), TalkByJT(SpeedOfVoltageChangeWithCC), TBSM.11672, DrawingsOfTheKEKBCrabCavity: 1, 2, 3 and 4, 800kWKlystronFromDESY(Philips), 250kWKlystronFromDESY(Thomson), BusbarBox.

- 4th meeting (10-12-09): TalkByRama(UpdatedAfterTheeeting), HERCrabCavity, byoKF50-flow.dwg, byoKF50-return.dwg, ImpedanceDataReceivedByRamaAfterTheMeeting: scratch.ReZ_AT_XY.0001.txt, scratch.ImZ_AT_XY.0001.txt, scratch.ReZx_AT_XY.0001.txt, scratch.ImZx_AT_XY.0001.txt, ODHIssues_FollowUpByNG.

- 5th meeting (16-12-09): PositionOfTheCrabCavityAndTheSPSCollimators_RequestFromTheCCinSWorkingGroup, PicturesAroundQD517TakenByOliverAberleOn18-12-2009: 1 and 2.